More than 10 years executing projects in due time and proper form for public and private works. Please feel free to contact our clients and ask for references of our work!
Project and Location |
Contract Type and Final Amount |
Start and Completion Dates |
Name and Phone # of Owner & A/E References |
Various Fire Stations Concrete Work | General Contractor $86,619.11 | 08/01/2009 11/15/2009 | City of Berkekey Reeve Battle 510-981-6336 |
Emergency Generator Redwood High School Larkspur CA. S.W: Trenching, Concrete and Asphalt |
Subcontractor: California Constructores General Contractor: ERA Construction Inc $45,600 |
May 2009 July 2009 45 days
|
Owner:Tamalpais Union High School. Contact: Roberta Whal Plum Architects (415) 837 0900
|
New Handicaps Ramps 2009-2010 S.W: Demolition, forms, pour concrete and asphalt | General Contractor: California Constructores
$221,000 | July 2009 200 days | Owner: City of Albany Contact: Ana Bernardes 510-524-3751 |
Kennedy High School Richmond, CA. New Boilers S.W: Concrete Foundation |
Subcontractor: California Constructores General Contractor: ERA Construction Inc
$13,500.00 |
November-09 60 days |
Owner: W.C.CU.SD Contact. Herman Blackmon JR. (510) 593.9882 (IOR) Steve Cayson (510) 812.0606 |
Park PacificaTank Roadway Retaining Wall Pacifica, CA S.W. Wall Concrete. |
Subcontractor: California Constructores General Contractor: ERA Construction Inc
$29,600.00 |
May 2009 30 days |
Owner: North Bay Water District Contact; Kevin O’Connel (650) 355-3462
|
Coronado Elementary Countertop and plumbing Fixtures Replacement | Subcontractor: California Constructores General Contractor: ERA Construction Inc
$37,500.00 |
Jun-09 July-09 25 days |
Owner. WCCUSD. Contact: Sonya Perkins Project Manager. (510)412.5657
|
Project and Location |
Contract Type and Final Amount |
Start and Completion Dates |
Name and Phone # of Owner & A/E References |
ERP Carpentry, storm drain, Sewer, asphalt. Windows, Landscape, Fencing | General Contractor California Constructores $25,000.00 | July 2010 30 days | Owner: W.C.CU.S.D Contact. Joe Mayes (510) .8120732
|
Stege Elementary School Concrete wall | Subcontractor: California Constructores General Contractor: ERA Construction Inc $ 19,000 | August-2010 December-2010 200 days | Owner West Contra Costa School District Joe Mayes (510) .8120732
|
Emergency Road Helms School Pavers Installation | General Contractor: California Constructores: 77,800 | November-2010 December 2010 30 days | Owner West Contra Costa School District Hector De Leon 510-364-2647 |
R.F.S. Fueling Station Excavation | Subcontractor: California Constructores General Contractor: ERA Construction Inc $ 41,900 | December 2010 February 2010 120 days | University of California Berkeley Allan Palmer 510-642-1196
|
Collins Elementary School Portable Connections Painting portables | Subcontractor: California Constructores General Contractor: ERA Construction Inc $ 16,900 | August, 8-August 25 – 2011 | Owner WCCUSD Contact: Roberto Vargas 408-590-4516 |
Crespi Middle School Mop Up Project Install Divisions between two Classrooms, Painting | Subcontractor: California Constructores General Contractor: ERA Construction Inc $ 22,000 | July 23 – August 23, 2011 | Owner WCCUSD Contact: Joe Mayes 510-812-0732 |
Miscellaneous Concrete Repairs 2010-2012 Ramps, Driveways, Curb and Gutters, Vertical Curbs and sidewalks | Sub Contractor: California Constructores General: ERA Construction Inc 625,000 | June, 2011 to present | Owner City of Richmond Contact: Ing. Tawfic Halaby 510-621-1612 |
Project and location | Contract type and final amount | Start and completion dates | Name and Phone # of Owner & A/E References |
Mira Vista Portables Installation Trenching, asphalt, lights, electrical, landscaping, data, communications, alarm. | General Contractor : California Constructores
115,000 |
June 15 to September 20, 2011 | Owner WCCUSD Contact: Roberto Vargas 408-590-4516 |
Mira Vista Stoops Project Demo, ramps, concrete | General Contractor : California Constructores 48,900 |
July 2012 to August 18, 2012 | Owner WCCUSD Contact: Hector De Leon 510-364-2647 |
West St. Pathway Berkeley Concrete, fence, electrical | General Contractor : California Constructores 285,000 |
July 2012 to February 2013 | Owner City of Berkeley Contact: Paul K. 510-981-6396 |
Burg Park Richmond Concrete | General Contractor ERA Construction Inc 85,000 | July to November 2013
| Owner City of Richmond Contact: Chris Chamberlier Maintenance Division |
Maryland Walk and El Mirador Pathway Concrete | General Contractor : California Constructores 19,000 |
September 2013 | Owner City of Berkeley Contact: Vincent Chen 510-981-6396 |
Le Conte Safe Routes To School Projects | General Contractor: ERA Construction Inc Subcontractor: CALICO 425,430 | July 2018 to September 2018 | Owner City of Berkeley, CA Contact: Reeve Battle 510-697-7343
|
Restroom &Waterline Wild Cat Canyon Project | General Contractor: ERA Construction Inc Subcontractor: CALICO 235,250 | March 2018 to June 2018 | Owner East Regional Park District Contact: Jeff Rasmussen 510 544 2130 |
Point Isabel Regional Shoreline Public Access & Shoreline Protection Project | General Contractor: ERA Construction Inc Subcontractor: CALICO 785,000 | August 2018 to November 2018 | Owner East Regional Park District Contact: Jeff Rasmussen 510 544 2130 |
Gilman | General Contractor: ERA Construction Inc Subcontractor: CALICO |
|
|
Cutting Boulevard Crossing Safety Improvement Project | General Contractor: ERA Construction Inc Subcontractor CALICO 435,937 | October 2019 to December 2019 | Owner City of Richmond, CA Contact: Dane Rodgers 510-376 2492 |
Project and location | Contract type and final amount | Start and completion dates | Name and Phone # of Owner & A/E References |
PRW 2019 and 2020 Facilities and Forestry Concrete Work | General Contractor: ERA Subcontractor: CALICO 385,000 | July 2019 to October 2020 | Owner City of Berkeley, CA Contact: Bruce Pratt 510-542-3152 |
Strawberry Creek Park Play Area and Restroom Renovation Project | General Contractor: ERA Construction Inc Subcontractor: CALICO 815,000 | July 2020 to November 2020 | Owner City of Berkeley, CA Contact: Isaac Carnegie 510-981-6432
|
PRW 2021 Facilities and Forestry Concrete Work | General Contractor: ERA Construction Inc Subcontractor: CALICO TBD | January 2021 to Present | Owner City of Berkeley, CA Contact: Bruce Pratt 510-542-3152 |
Gilman Railroad Pedestrian Crossing Safety Projects | General Contractor ERA Construction Inc Subcontractor: California Constructores 344,760.76 | August 2019 To February 2020 | City of Berkeley Contact: Randy Kong 510-423-8419
|
King Park Renovation | General Contractor ERA Construction Inc Subcontractor: California Constructores 561,000 | August 2019 To February 2020 | City of Berkeley Contact: Isaac Carnegie 510-981-6432
|
FY2020 Sidewalk Repairs | General California Constructores California Constructores 2’000,000 | July 2022 to current | City of Berkeley Contact: Reeve Battle 510-981-6336 |
Project and Location |
Contract Type and Final Amount |
Start and Completion Dates |
Name of A/E References |
Various Fire Stations Concrete Work |
General Contractor |
08/01/2009 11/15/2009 |
City of Berkekey |
Emergency Generator Redwood High School Larkspur CA. S.W: Trenching, Concrete and Asphalt |
Subcontractor: California Constructores General Contractor: ERA Construction Inc |
May 2009 July 2009 45 days |
Owner: Tamalpais Union High School.
|
New Handicaps Ramps 2009-2010 S.W: Demolition, forms, pour concrete and asphalt |
General Contractor: California Constructores |
July 2009 200 days |
Owner: City of Albany |
Kennedy High School Richmond, CA. New Boilers S.W: Concrete Foundation |
Subcontractor: California Constructores General Contractor: ERA Construction Inc |
November-09 60 days |
Owner: W.C.CU.SD |
Park PacificaTank Roadway Retaining Wall Pacifica, CA S.W. Wall Concrete. |
Subcontractor: California Constructores General Contractor: ERA Construction Inc |
May 2009 30 days |
Owner: North Bay Water District
|
Coronado Elementary Countertop and plumbing Fixtures Replacement |
Subcontractor: California Constructores General Contractor: ERA Construction Inc |
Jun-09 July-09 25 days |
Owner. WCCUSD.
|
Project and Location |
Contract Type and Final Amount |
Start and Completion Dates |
Name and Phone # of Owner & A/E References |
ERP Carpentry, storm drain, Sewer, asphalt. Windows, Landscape, Fencing |
General Contractor California Constructores |
July 2010 30 days |
Owner: W.C.CU.S.D
|
Stege Elementary School Concrete wall |
Subcontractor: California Constructores General Contractor: ERA Construction Inc |
August-2010 December-2010 200 days |
Owner West Contra Costa School District
|
Emergency Road Helms School Pavers Installation |
General Contractor: California Constructores: |
November-2010 December 2010 30 days |
Owner West Contra Costa School District |
R.F.S. Fueling Station Excavation |
Subcontractor: California Constructores General Contractor: ERA Construction Inc |
December 2010 February 2010 120 days |
University of California Berkeley
|
Collins Elementary School Portable Connections Painting portables |
Subcontractor: California Constructores General Contractor: ERA Construction Inc |
August, 8-August 25 – 2011 |
Owner WCCUSD |
Crespi Middle School Mop Up Project Install Divisions between two Classrooms, Painting |
Subcontractor: California Constructores General Contractor: ERA Construction Inc |
July 23 – August 23, 2011 |
Owner WCCUSD |
Miscellaneous Concrete Repairs 2010-2012 Ramps, Driveways, Curb and Gutters, Vertical Curbs and sidewalks |
Sub Contractor: California Constructores General: ERA Construction Inc |
June, 2011 to present |
Owner City of Richmond |
Project and location |
Contract type and final amount |
Start and completion dates |
Name and Phone # of Owner & A/E References |
Mira Vista Portables Installation Trenching, asphalt, lights, electrical, landscaping, data, communications, alarm. |
General Contractor : California Constructores |
June 15 to September 20, 2011 |
Owner WCCUSD |
Mira Vista Stoops Project Demo, ramps, concrete |
General Contractor : California Constructores |
July 2012 to August 18, 2012 |
Owner WCCUSD |
West St. Pathway Berkeley Concrete, fence, electrical |
General Contractor : California Constructores |
July 2012 to February 2013 |
Owner City of Berkeley |
Burg Park Richmond Concrete |
General Contractor ERA Construction Inc |
July to November 2013 |
Owner City of Richmond |
Maryland Walk and El Mirador Pathway Concrete |
General Contractor : California Constructores |
September 2013 |
Owner City of Berkeley |
Le Conte Safe Routes To School Projects |
General Contractor: ERA Construction Inc Subcontractor: CALICO |
July 2018 to September 2018 |
Owner City of Berkeley, CA
|
Restroom &Waterline Wild Cat Canyon Project |
General Contractor: ERA Construction Inc Subcontractor: CALICO |
March 2018 to June 2018 |
Owner East Regional Park District |
Point Isabel Regional Shoreline Public Access & Shoreline Protection Project |
General Contractor: ERA Construction Inc Subcontractor: CALICO |
August 2018 to November 2018 |
Owner East Regional Park District |
Gilman |
General Contractor: ERA Construction Inc Subcontractor: CALICO |
|
|
Cutting Boulevard Crossing Safety Improvement Project |
General Contractor: ERA Construction Inc Subcontractor CALICO |
October 2019 to December 2019 |
Owner City of Richmond, CA |
Project and location |
Contract type and final amount |
Start and completion dates |
Name and Phone # of Owner & A/E References |
PRW 2019 and 2020 Facilities and Forestry Concrete Work |
General Contractor: ERA Subcontractor: CALICO |
July 2019 to October 2020 |
Owner City of Berkeley, CA |
Strawberry Creek Park Play Area and Restroom Renovation Project |
General Contractor: ERA Construction Inc Subcontractor: CALICO |
July 2020 to November 2020 |
Owner City of Berkeley, CA
|
PRW 2021 Facilities and Forestry Concrete Work |
General Contractor: ERA Construction Inc Subcontractor: CALICO TBD |
January 2021 to Present |
Owner City of Berkeley, CA |
Gilman Railroad Pedestrian Crossing Safety Projects |
General Contractor ERA Construction Inc Subcontractor: California Constructores |
August 2019 To February 2020 |
City of Berkeley
|
King Park Renovation |
General Contractor ERA Construction Inc Subcontractor: California Constructores |
August 2019 To February 2020 |
City of Berkeley
|
FY2020 Sidewalk Repairs |
General California Constructores California Constructores |
July 2022 to current |
City of Berkeley |
Project and Location |
Contract Type and Final Amount |
Name of A/E References |
Various Fire Stations Concrete Work |
General Contractor |
City of Berkekey |
Emergency Generator Redwood High School Larkspur CA. S.W: Trenching, Concrete and Asphalt |
Subcontractor: California Constructores General Contractor: ERA Construction Inc |
Owner: Tamalpais Union High School. |
New Handicaps Ramps 2009-2010 S.W: Demolition, forms, pour concrete and asphalt |
General Contractor: California Constructores | Owner: City of Albany |
Kennedy High School Richmond, CA. New Boilers S.W: Concrete Foundation |
Subcontractor: California Constructores General Contractor: ERA Construction Inc |
Owner: W.C.CU.SD |
Park PacificaTank Roadway Retaining Wall Pacifica, CA S.W. Wall Concrete. |
Subcontractor: California Constructores General Contractor: ERA Construction Inc |
Owner: North Bay Water District
|
Coronado Elementary Countertop and plumbing Fixtures Replacement |
Subcontractor: California Constructores General Contractor: ERA Construction Inc |
Owner: WCCUSD.
|
| ||
ERP Carpentry, storm drain, Sewer, asphalt. Windows, Landscape, Fencing |
General Contractor California Constructores | Owner: W.C.CU.S.D |
Stege Elementary School Concrete wall |
Subcontractor: California Constructores General Contractor: ERA Construction Inc | Owner West Contra Costa School District |
Emergency Road Helms School Pavers Installation |
General Contractor: California Constructores: |
Owner West Contra Costa School District |
R.F.S. Fueling Station Excavation |
Subcontractor: California Constructores General Contractor: ERA Construction Inc. | University of California Berkeley
|
Collins Elementary School Portable Connections Painting portables |
Subcontractor: California Constructores General Contractor: ERA Construction Inc |
Owner WCCUSD |
Crespi Middle School Mop Up Project Install Divisions between two Classrooms, Painting |
Subcontractor: California Constructores General Contractor: ERA Construction Inc | Owner WCCUSD |
Miscellaneous Concrete Repairs 2010-2012 Ramps, Driveways, Curb and Gutters, Vertical Curbs and sidewalks |
Sub Contractor: California Constructores General: ERA Construction Inc | Owner City of Richmond |
Project and location |
Contract type and final amount |
Name and Phone # of Owner & A/E References |
Mira Vista Portables Installation Trenching, asphalt, lights, electrical, landscaping, data, communications, alarm. |
General Contractor : California Constructores | Owner WCCUSD |
Mira Vista Stoops Project Demo, ramps, concrete |
General Contractor : California Constructores | Owner WCCUSD |
West St. Pathway Berkeley Concrete, fence, electrical |
General Contractor : California Constructores |
Owner City of Berkeley |
Burg Park Richmond Concrete |
General Contractor ERA Construction Inc |
Owner City of Richmond |
Maryland Walk and El Mirador Pathway Concrete |
General Contractor : California Constructores | Owner City of Berkeley |
Le Conte Safe Routes To School Projects |
General Contractor: ERA Construction Inc Subcontractor: CALICO |
Owner City of Berkeley, CA
|
Restroom &Waterline Wild Cat Canyon Project |
General Contractor: ERA Construction Inc Subcontractor: CALICO |
Owner East Regional Park District |
Point Isabel Regional Shoreline Public Access & Shoreline Protection Project |
General Contractor: ERA Construction Inc Subcontractor: CALICO | Owner East Regional Park District |
Gilman |
General Contractor: ERA Construction Inc Subcontractor: CALICO |
|
Cutting Boulevard Crossing Safety Improvement Project |
General Contractor: ERA Construction Inc Subcontractor CALICO |
Owner City of Richmond, CA |
| ||
PRW 2019 and 2020 Facilities and Forestry Concrete Work |
General Contractor: ERA Subcontractor: CALICO |
Owner City of Berkeley, CA |
Strawberry Creek Park Play Area and Restroom Renovation Project |
General Contractor: ERA Construction Inc Subcontractor: CALICO |
Owner City of Berkeley, CA
|
PRW 2021 Facilities and Forestry Concrete Work |
General Contractor: ERA Construction Inc Subcontractor: CALICO TBD |
Owner City of Berkeley, CA |
Gilman Railroad Pedestrian Crossing Safety Projects |
General Contractor ERA Construction Inc Subcontractor: California Constructores |
City of Berkeley
|
King Park Renovation |
General Contractor ERA Construction Inc Subcontractor: California Constructores |
City of Berkeley
|
FY2020 Sidewalk Repairs |
General California Constructores California Constructores |
City of Berkeley |
Project and Location |
Contract Type and Final Amount |
Name and Phone # of Owner & A/E References |
Various Fire Stations Concrete Work | General Contractor $86,619.11 | City of Berkekey Reeve Battle 510-981-6336 |
Emergency Generator Redwood High School Larkspur CA. S.W: Trenching, Concrete and Asphalt |
Subcontractor: California Constructores General Contractor: ERA Construction Inc $45,600 |
Owner:Tamalpais Union High School. Contact: Roberta Whal Plum Architects (415) 837 0900
|
New Handicaps Ramps 2009-2010 S.W: Demolition, forms, pour concrete and asphalt | General Contractor: California Constructores
$221,000 | Owner: City of Albany Contact: Ana Bernardes 510-524-3751 |
Kennedy High School Richmond, CA. New Boilers S.W: Concrete Foundation |
Subcontractor: California Constructores General Contractor: ERA Construction Inc
$13,500.00 |
Owner: W.C.CU.SD Contact. Herman Blackmon JR. (510) 593.9882 (IOR) Steve Cayson (510) 812.0606 |
Park PacificaTank Roadway Retaining Wall Pacifica, CA S.W. Wall Concrete. |
Subcontractor: California Constructores General Contractor: ERA Construction Inc
$29,600.00 |
Owner: North Bay Water District Contact; Kevin O’Connel (650) 355-3462
|
Coronado Elementary Countertop and plumbing Fixtures Replacement | Subcontractor: California Constructores General Contractor: ERA Construction Inc
$37,500.00 |
Owner. WCCUSD. Contact: Sonya Perkins Project Manager. (510)412.5657
|
Project and Location |
Contract Type and Final Amount |
Name and Phone # of Owner & A/E References |
ERP Carpentry, storm drain, Sewer, asphalt. Windows, Landscape, Fencing | General Contractor California Constructores $25,000.00 | Owner: W.C.CU.S.D Contact. Joe Mayes (510) .8120732
|
Stege Elementary School Concrete wall | Subcontractor: California Constructores General Contractor: ERA Construction Inc $ 19,000 | Owner West Contra Costa School District Joe Mayes (510) .8120732
|
Emergency Road Helms School Pavers Installation | General Contractor: California Constructores: 77,800 | Owner West Contra Costa School District Hector De Leon 510-364-2647 |
R.F.S. Fueling Station Excavation | Subcontractor: California Constructores General Contractor: ERA Construction Inc $ 41,900 | University of California Berkeley Allan Palmer 510-642-1196
|
Collins Elementary School Portable Connections Painting portables | Subcontractor: California Constructores General Contractor: ERA Construction Inc $ 16,900 | Owner WCCUSD Contact: Roberto Vargas 408-590-4516 |
Crespi Middle School Mop Up Project Install Divisions between two Classrooms, Painting | Subcontractor: California Constructores General Contractor: ERA Construction Inc $ 22,000 | Owner WCCUSD Contact: Joe Mayes 510-812-0732 |
Miscellaneous Concrete Repairs 2010-2012 Ramps, Driveways, Curb and Gutters, Vertical Curbs and sidewalks | Sub Contractor: California Constructores General: ERA Construction Inc 625,000 | Owner City of Richmond Contact: Ing. Tawfic Halaby 510-621-1612 |
Project and location | Contract type and final amount | Name and Phone # of Owner & A/E References |
Mira Vista Portables Installation Trenching, asphalt, lights, electrical, landscaping, data, communications, alarm. | General Contractor : California Constructores
115,000 | Owner WCCUSD Contact: Roberto Vargas 408-590-4516 |
Mira Vista Stoops Project Demo, ramps, concrete | General Contractor : California Constructores 48,900 | Owner WCCUSD Contact: Hector De Leon 510-364-2647 |
West St. Pathway Berkeley Concrete, fence, electrical | General Contractor : California Constructores 285,000 | Owner City of Berkeley Contact: Paul K. 510-981-6396 |
Burg Park Richmond Concrete | General Contractor ERA Construction Inc 85,000 | Owner City of Richmond Contact: Chris Chamberlier Maintenance Division |
Maryland Walk and El Mirador Pathway Concrete | General Contractor : California Constructores 19,000 | Owner City of Berkeley Contact: Vincent Chen 510-981-6396 |
Le Conte Safe Routes To School Projects | General Contractor: ERA Construction Inc Subcontractor: CALICO 425,430 | Owner City of Berkeley, CA Contact: Reeve Battle 510-697-7343
|
Restroom &Waterline Wild Cat Canyon Project | General Contractor: ERA Construction Inc Subcontractor: CALICO 235,250 | Owner East Regional Park District Contact: Jeff Rasmussen 510 544 2130 |
Point Isabel Regional Shoreline Public Access & Shoreline Protection Project | General Contractor: ERA Construction Inc Subcontractor: CALICO 785,000 | Owner East Regional Park District Contact: Jeff Rasmussen 510 544 2130 |
Gilman | General Contractor: ERA Construction Inc Subcontractor: CALICO |
|
Cutting Boulevard Crossing Safety Improvement Project | General Contractor: ERA Construction Inc Subcontractor CALICO 435,937 | Owner City of Richmond, CA Contact: Dane Rodgers 510-376 2492 |
Project and location | Contract type and final amount | Name and Phone # of Owner & A/E References |
PRW 2019 and 2020 Facilities and Forestry Concrete Work | General Contractor: ERA Subcontractor: CALICO 385,000 | Owner City of Berkeley, CA Contact: Bruce Pratt 510-542-3152 |
Strawberry Creek Park Play Area and Restroom Renovation Project | General Contractor: ERA Construction Inc Subcontractor: CALICO 815,000 | Owner City of Berkeley, CA Contact: Isaac Carnegie 510-981-6432
|
PRW 2021 Facilities and Forestry Concrete Work | General Contractor: ERA Construction Inc Subcontractor: CALICO TBD | Owner City of Berkeley, CA Contact: Bruce Pratt 510-542-3152 |
Gilman Railroad Pedestrian Crossing Safety Projects | General Contractor ERA Construction Inc Subcontractor: California Constructores 344,760.76 | City of Berkeley Contact: Randy Kong 510-423-8419
|
King Park Renovation | General Contractor ERA Construction Inc Subcontractor: California Constructores 561,000 | City of Berkeley Contact: Isaac Carnegie 510-981-6432
|
FY2020 Sidewalk Repairs | General California Constructores California Constructores 2’000,000 | City of Berkeley Contact: Reeve Battle 510-981-6336 |
510-932-9899
caconstructores@att.net
1220 Marin Ave. San Pablo CA 94806 License: 929845 AB.
Mon - Fri :
10:00 a. m. – 07:00 p. m.
Saturday:
10:00 a. m. – 5:00 p.m.
Sunday: Closed.
510-932-9899
caconstructores@att.net
1220 Marin Ave, Sasan Pablo CA 94806 License: 929845 A,
Mon - Fri :
10:00 a. m. – 07:00 p. m.
Saturday:
10:00 a. m. – 5:00 p.m.
Sunday: Closed.